BEP Engineering has been working with ecoPHASER Energy Corp. in helping them develop biomass-fueled power stations for applications using wood waste, animal waste and other typically non-viable biomass sources. ecoPHASER power stations have been engineered as highly efficient energy generators that exceed environmental guidelines with a hot, clean gasification process that requires minimal secondary scrubbing. The result is a lower cost of capital, reduced fuel requirements and higher energy output making the ecoPHASER power station a preferred choice in remote areas and where communities are seeking a means for disposing of unwanted waste and a power source for new industry. BEP Engineering has been working on the new Mark VII Gasifier that ecoPHASER Energy Corp. started developing in 2007. BEP Engineering has taken this unit from the development stage to the drawing stage using Solid Works a 3D drafting program creating the drawings of this unit and fine tuning it for easy fabrication and maintenance. BEP took this one step farther by using there 28 years of material handling experience we created a unique feed system that had to allow for break downs since power plants have to operate 24/7 and produce a specific amount of energy continually or they are fined. This meant BEP had to do research for equipment and parts that are readily available and have an above average life span. We also had to allow for metered mixing of different waste/fuels to increase the power plants sustainability.